
Columbia Power & Water Systems Long-Term Water Supply Program
The public utility Columbia Power & Water Systems launched a major infrastructure project to strengthen its long-term water supply, including a new intake system and expansion of its existing treatment facilities. This investment will enhance drought resiliency while meeting the region’s growing water demands.
M2 Group is providing comprehensive surveying support for the infrastructure initiative. Our scope includes route surveys along the 25-mile proposed raw water intake line, design-level topographic survey of the treatment plant, aerial imagery collection, and preparation of legal descriptions for both permanent utility installation and temporary construction easements. Work on this project began in 2023 and continues to progress.
Project Location:
Market:
Services:
Project Highlights:
- Regional water infrastructure project
- 25-mile raw water intake system
- Water treatment facility expansion
The public utility Columbia Power & Water Systems launched a major infrastructure project to strengthen its long-term water supply, including a new intake system and expansion of its existing treatment facilities. This investment will enhance drought resiliency while meeting the region’s growing water demands.
M2 Group is providing comprehensive surveying support for the infrastructure initiative. Our scope includes route surveys along the 25-mile proposed raw water intake line, design-level topographic survey of the treatment plant, aerial imagery collection, and preparation of legal descriptions for both permanent utility installation and temporary construction easements. Work on this project began in 2023 and continues to progress.