CarMax Auction and Production Facility
The CarMax Auction and Production Facility is an ongoing industrial development in Manchester, Tennessee, designed to support regional vehicle inspection and production operations. M2 Group provides civil engineering and land surveying services for the 27.86-acre site, delivering infrastructure that supports a high-capacity, multi-building facility.
The project requires extensive environmental coordination due to its proximity to regulated wetlands and existing watershed conditions. M2 Group is leading permitting and stormwater planning efforts to preserve hydrologic function while meeting local and county approval requirements.
Additional complexity includes site planning around a major electrical transmission line, allowing parking and staging areas to function efficiently while maintaining required utility access. With a schedule tied to due diligence and closing milestones, the project is progressing on time and within budget while supporting CarMax’s continued commercial expansion.
Project Location:
Market:
Services:
Project Highlights:
- 27.86-acre commercial development featuring four buildings totaling 79,295 square feet
- Regional vehicle inspection and production facility supporting industrial operations
- Site planning and coordination around regulated wetlands, watershed preservation, and a major electrical transmission line
The CarMax Auction and Production Facility is an ongoing industrial development in Manchester, Tennessee, designed to support regional vehicle inspection and production operations. M2 Group provides civil engineering and land surveying services for the 27.86-acre site, delivering infrastructure that supports a high-capacity, multi-building facility.
The project requires extensive environmental coordination due to its proximity to regulated wetlands and existing watershed conditions. M2 Group is leading permitting and stormwater planning efforts to preserve hydrologic function while meeting local and county approval requirements.
Additional complexity includes site planning around a major electrical transmission line, allowing parking and staging areas to function efficiently while maintaining required utility access. With a schedule tied to due diligence and closing milestones, the project is progressing on time and within budget while supporting CarMax’s continued commercial expansion.