
Battlefield Drive Stormwater Improvements
Spanning approximately 400 linear feet along Battlefield Drive, this stormwater improvement project required land surveying services for the installation of five concrete box culverts and a Flexamat outfall system with connecting U-shaped concrete channel.
M2 Group provided comprehensive construction staking and as-built survey documentation, ensuring accurate installation and thorough project documentation for this critical public infrastructure initiative.
Project Location:
Market:
Services:
Project Highlights:
- Stormwater improvement project
- 5 concrete box culverts & outfall system
- Metro Nashville’s on-call services program
Spanning approximately 400 linear feet along Battlefield Drive, this stormwater improvement project required land surveying services for the installation of five concrete box culverts and a Flexamat outfall system with connecting U-shaped concrete channel.
M2 Group provided comprehensive construction staking and as-built survey documentation, ensuring accurate installation and thorough project documentation for this critical public infrastructure initiative.